Fractional AI Product Manager · Raleigh, NC
Developer tools with AI features have a fast feedback loop. Developers know immediately when a suggestion is wrong. If the inline suggestion misses 200ms p99 latency, they disable the feature within two weeks. The spec must state the latency requirement, the accuracy requirement, and a clear off-ramp before engineering starts.
Enterprise software AI features at Red Hat, SAS Institute, and IBM Research Triangle face a different requirement: model cards. Enterprise procurement teams are requesting documentation of training data provenance, known failure modes, and recommended use cases. A feature that ships without a model card fails enterprise security review. The AI PM writes the model card as part of the spec.
Fixed-scope engagement, agreed before work starts.
Tell us about your developer tool or enterprise AI feature.
Developer tools require dogfooding at a higher standard than consumer products. The people evaluating the AI feature are the same people who can tell immediately if the model output is wrong. A wrong suggestion in an autocomplete feature is obvious. A wrong suggestion in a code review feature is obvious. There is no gradual discovery of quality issues. The disable rate spikes immediately.
The 200ms p99 latency requirement for inline suggestions is not a preference. It is the threshold at which the feature becomes invisible. Below 200ms, the suggestion appears before the developer types past it. Above 200ms, the suggestion appears after the developer has already typed the next character, which produces a jarring interrupt. The product spec states this number explicitly. Engineering builds to it.
The accuracy requirement for developer tool AI features is harder to set without an evaluation protocol. The spec defines: the evaluation dataset (200 representative coding tasks in the relevant language and framework), the rubric criteria (syntactic validity, functional correctness, idiomatic style), the minimum pass rate, and who runs the evaluation before go-live.
At a company like Red Hat, idiomatic style means following Red Hat's internal conventions, not just the language's public conventions. The evaluation dataset must include examples that test for this, not just generic benchmark tasks.
Enterprise procurement teams at SAS Institute, IBM Research Triangle, and their customers are asking for model cards. Six sections, none of which require exposing competitive architecture.
The specific task the model is designed for and the user population it was evaluated against. Precise scope prevents the model card from being used as a general-purpose capability claim.
Accuracy or quality metrics on the relevant benchmark, the dataset used, and the evaluation date. Reported without describing the training process.
The task types, input conditions, or user contexts where the model performs below the stated threshold. Omitting this section causes the model card to fail procurement review.
How often the model is evaluated, what conditions trigger a model update, and what happens to existing integrations when the model version changes. Enterprise customers need this before they can onboard.
The milestone between a research prototype and a production feature requires five explicit criteria. Meeting three of them is not enough.
200ms p99 under expected concurrent user load, not on a quiet test server.
Accuracy threshold met on the defined evaluation dataset, not cherry-picked examples.
Failure modes documented and fallback behavior implemented and tested.
Per-session disable, persistent disable, and admin-level disable all working and tested.
Accuracy drift, latency regression, and disable rate observable in production before go-live.
Discovery call (1 hour)
We map the AI feature: developer tool or enterprise software, current prototype state, what the production milestone requires, and which stakeholders need to sign off. Fixed price quoted at the end of this call.
Spec and model card sprint (weeks 1–5)
We write the product spec with latency requirements, accuracy threshold, failure mode spec, and off-ramp specification. We produce the model card. We circulate for review.
Production milestone sign-off (weeks 6–8)
We define the five production milestone criteria with engineering, confirm the monitoring spec, and produce the go-live checklist. The engagement ends when the checklist is ready to use.
Scope your developer tool or enterprise AI feature spec.
Tell us what the AI feature does, what the current prototype state is, and which production requirements are not yet defined. We reply within one business day.