Construction
A project manager reading a 200-page contract for clause-level risk. A procurement team processing 40 subcontractor prequalification packages. A PM manually writing the same owner status report every Friday from five different data sources.
We build AI systems for construction companies that handle the document processing and reporting layer, contract review, subcontractor qualification, RFI processing, and project status reporting: integrated with Procore, Autodesk, or your existing project management stack.
Tell us about your project document workflow.
Five specific AI workflows for construction operations.
AI reads construction contracts (GC agreements, subcontracts, owner-furnished forms) and flags non-standard clauses, indemnification provisions, limitation of liability terms, and payment timing issues. Your PM reviews flags, not full documents.
Collect and process insurance certificates, safety records, bonding capacity, financial statements, and past project references from subcontractors. Flags missing documents and expired coverages before they reach your prequalification team.
AI classifies incoming RFIs and change order requests by trade, specification section, and cost impact category. Generates structured summaries for project logs and routes to the correct design or field contact.
Classify and analyze safety incident reports by type, cause category, and severity. Surface patterns across projects, crews, and work activities to support your EHS team's incident prevention programs.
Pull data from your project management system and generate owner-ready project status reports (schedule adherence, budget variance, open RFIs, outstanding submittals) at the reporting cadence each owner requires.
Companies expecting AI to replace legal review of contracts
AI flags non-standard clauses and identifies risk provisions. It does not provide legal advice. Material contracts should still be reviewed by your legal counsel. AI reduces the volume of documents that reach your attorney, not the need for an attorney.
Projects without digital project management infrastructure
Status report generation and RFI processing require data from a project management system (Procore, Autodesk, or equivalent). Paper-based project management creates a data entry step before AI can be useful.
Micro-contractors without document volume to justify the investment
We have a minimum engagement size for this type of work. Small contractors handling fewer than 10 subcontractors or one or two active projects will not generate enough document volume for the AI to provide meaningful ROI.
Tell us which document type or reporting workflow is consuming the most PM or document control time. We will reply within one business day with a rough scope and price range.